Euroaquappr sakkti polymers
SAKKTHI POLYMERS
ISO 9001:2008 Certified Company
Euroaquappr
Quality Assurance & Quality Checking Process
System Control
The production of a quality controlled pipe system and demands the supervision, regulation and control of all work operations. All results and processes have to be documented.
This requires
euroaquappr Test and acceptance and of incoming goods
euroaquappr Process control
euroaquappr In-process inspection and test
euroaquappr Final inspection and test
Relevant regulations for the quality control of potable water pipe system are:
euroaquappr BIS & DIN-guidelines
euroaquappr Working sheets
euroaquappr Supervisory Regulations of the ISO 9001:2008
These standard and guidelines detail the minimum requirements for internal control.
Conformance to the standards is verified by in dependent institutes in form of internal audits and laboratory tests.

Euroaqua has many years of experience in extrusion and injection moulding and is the market leader and pioneer in the manufacture of polypropylene pipe systems in India
Internal control
Trained and qualified employees and a modern equipped laboratory ensure that all tests are carried out and regulations are complied with in accordance with the quality control policy, which includes
euroaquappr Control of inspection , measuring and test equipment
euroaquappr Process and production control
euroaquappr Receiving inspection test
euroaquappr In-process inspection
euroaquappr Final inspection
All internal quality controls are documented and recorded in acc. With the quality control policy
Test and acceptance of incoming goods
All incoming goods are subject to a test .This ensures that incoming products conform to specified requirements. Goods, which have not been tested are not released for production
In-process inspection and test
our quality assurance department preproduction samples are tested by the laboratory technicians for
euroaquappr Surface Finish
euroaquappr Dimensional accuracy of the test samples
euroaquappr Data from extrusion and injection moulding machines
The goods will be released for production only if optimal test results are achieved. These tests are carried out at the beginning of each production series to ensure perfect system quality.
Final Inspection & Test
Finished products are only released to stock when all tests and inspections conform to the prescribed procedures and specifications.

The final inspection and test covers the following test procedures:
euroaquappr Dimensional Control
euroaquappr Surface Finish
euroaquappr Measurement of the melt flow index
euroaquappr Impact bending test
euroaquappr Heat reversion test
euroaquappr Homogeneity of the material
euroaquappr Internal pressure test
 
 
 
 
MAJOR PRODUCTS: PPR PIPES PPR FITTINGS PP-RC PIPES PP-RC FITTINGS PP-R PIPES PP-R FITTINGS
About Company
PVC FLEXIBLE HOSES PNEUMATIC PIPES PLUMBING PIPES HOT WATER PIPES CHILLER PIPES PLASTIC PIPES
Products
UPVC PLUMBING PIPES IRRIGATION PIPES SUCTION HOSES BRAIDED HOSES WATER TANKS PPRC PIPES & FITTINGS
Sitemap
Catalogue News & Events Contact
Copyrights 2013 © Sakkthi Polymers Designed and Maintained : Trendz